One, material
It is made of cold rolled profiles of high quality raw materials.
Two, manufacturing and processing:
1. the manufacturing tolerances of all components are + 5mm, and the raw material tolerances are + 0....
Look at the details+
1. Construction and installation:
1. according to the drawing, the site should be scribed and zoning to ensure that it is in line with the size of the drawing.
2. when construction workers enter the scene, they must d...
Look at the details+
1. Production cycle:
Area time production cycle installation cycle total cycle
10000-20000 square meters, 25 days, 7 days and 32 days
5000-10000 square meters, 20 days, 7 days and 27 days
1000-5000 square meters, 15...